Injection Mold Tooling is safeguarded suggested at 15 o'clock with what maintain
- Time:
- Click:128
- source:PHAUP CNC Machining
2cm, cannot be wiped with the hand absolutely or cotton silk is brushed, application compresses air to blow, or dip in with advanced napkin and advanced pledget on alcohol is brushed gently. 7, model antrum surface should undertake cleaning regularly, inject mould is in shape a small element compound often can be decomposed to corrode mould antrum in the process, make shining model antrum surface becomes dim gradually do not have light and reduce product quality, because this needs to be swabbed regularly, it is OK to swab use alcohol kind or after ketone preparation is swabbed, want to be blown in time dry. 8, the operation leaves need to stop temporarily when machine, should close the mould on, do not let model antrum and model core is exposed outer, injure accidentally in case, machine down time predicts to exceed 24 hours, should be in model antrum, model on core surface gush antirust oil or agent of drawing of patterns, mix in damp area especially monsoon, time is again short also should do antirust processing. The lunt in air can make diminution of quality of modular antrum surface, goods surface quality drops. When the mould is used again, the oily purify that should get on the mould, the ability after wipe up can be used, what lens face asks is clean compress air to blow sirocco of the reoccupy after working dry, meet otherwise oozy when shape and make products appears blemish. 9, stop machine hind to switch on the mobile phone temporarily, slide block spacing should be checked to whether move after opening a mould, did not discover unusual ability combines a model. Anyhow, before switching on the mobile phone must scrupulous, cannot carelessness. 10, the service life that to extend cooling water, when mould out of service, should use instantly compress air to keep clear of the water inside cooling aqueduct, put chew mouth ministry with a few engine oil, reoccupy compresses air to blow, make all cooling conduit have an antirust oil reservoir. 11, the working status that each control unit checks seriously in the job, take strict precautions against support system happening unusual, heat, those who control a system maintain want to heating up flow path mould to be weighed particularly. After each production cycle ends, answer strong pattern heater, belt heater, thermocouple learns to undertake metrical with Europe mother, explain with the technology of the mould data phase is compared, in order to assure its of the function in good condition. Meanwhile, control loop may pass installation to check in the ammeter inside loop. The oil in smoking the hydraulic pressure jar that core uses is discharged as far as possible empty, oily and sealed, lest be in store the environment all round the discharge outside oil of the hydraulic pressure in carry process or pollution. 12, aborning hears a mould to give out allophone or general reason of occurrence other different besides, answer to stop machine examination instantly. Mould maintenance technician should undertake to the mould that moves normally inside the workshop itinerate is checked, when discovery has unusual appearance, answer to be handled in time. 13, when jockey is making shift, besides hand over production, technology is crucial outside crucial record, to the mould use state also should have explain in detail. 14, when the mould the goods that finish produces an amount, should deplane change when other mould, should get on the besmear inside mould antrum antirust, the member that the mould mould of its accessory deliver maintains, the product that adds last model to produce qualification serves as appearance the member that a deliver maintains. In addition, still answer a mould uses deliver detailed list, fill in in detail this mould is on what machine tool, from, symbiosis produces product of how many amount, the mould is good now. If the model has a problem, should fill in on use sheet this mould exists what problem, raise the specific requirement that revise and perfects, meet one standard unsettled sample gives a keeper, leave a mould the reference when labour builds a model. 15, should establish mould warehouse, set government of person specially assigned for a task, establish mould record, possible sentence should execute computer management to the mould. Mould library should choose humidity small ventilated place, temperature should maintain in 70% the following, if humidity exceeds 70% , criterion the mould rusts very easily, mould should go up frame deposit, notice anticorrosion, dustproof wait. Should need to repair on mark or finish repair, the label that maintain. CNC Milling CNC Machining